Explore Concert Hall Architecture and more!

Gallery of Construction Begins on OPEN's Pingshan Performing Arts Center in Shenzhen - 16

Gallery of Construction Begins on OPEN's Pingshan Performing Arts Center in Shenzhen - 16

adjkm's Releases Final Design for Caracas Symphony,CASMSB - Section 1. Image Courtesy of adjkm

Gallery of adjkm's Releases Final Design for Caracas Symphony - 18

adjkm's Releases Final Design for Caracas Symphony,CASMSB - Section Image Courtesy of adjkm

Galeria - Hotel Agglo / Gardera-D Architecture - 231

Galeria de Hotel Agglo / Gardera-D Architecture - 24

La Enseñanza  School Auditorium / OPUS + MEJÍA                                                                                                                                                                                 More

Auditorio Colegio la Enseñanza / OPUS + MEJÍA / OPUS + MEJÍA

The Auditorium of the Company of Mary – La Enseñanza School – Medellin, arose out of an analysis of its location, its different levels and the.

FHE – Fundação Habitacional do Exército, corte AA (auditório). Escritório MGS – Macedo, Gomes & Sobreira<br />Desenho dos autores

FHE – Fundação Habitacional do Exército, corte AA (auditório). Escritório MGS – Macedo, Gomes & Sobreira<br />Desenho dos autores

Gallery - La Enseñanza School Auditorium / OPUS + MEJÍA - 20

Auditorio Colegio la Enseñanza / OPUS + MEJÍA / OPUS + MEJÍA

Camelot Theatre | Bruce Richey, Architect, AIA LEED AP BD C | Archinect

Ground plans play a huge role on how the set will be built. The stage manager can also use this in order to help track blocking and props.

Boulevard - National Association of City Transportation Officials

In my previous post, I illustrated a few ways that cities have given their infrastructure much-needed makeovers. But there is some urban infrastructure out there that’s already pretty welcoming for…

London 2012 Basketball Arena / Wilkinson Eyre Architects

London 2012 Basketball Arena / Wilkinson Eyre Architects

Grand Canal Square Theatre section. In 2003 Daniel Libeskind won the competition for designing a Cultural Centre at the re-developed Harbour of Dublin. The brief requested the design of a 2100 seat Theatre for Musical/Road-show productions from amplified shows to opera/ballet standard. The concept of the 13,768 sq.m.

In 2003 Daniel Libeskind won the competition for designing a Cultural Centre at the re-developed Harbour of Dublin. The brief requested the design of a 2100 seat Theatre for Musical/Road-show producti…

Pinterest
Search