7:45 am we begin marking out the Skelton Project.

7:45 am we begin marking out the Skelton Project.

The 4 inch base is ready for final grading.

The 4 inch base is ready for final grading.

We return April 1 to begin the deck set up.

We return April 1 to begin the deck set up.

Calistoga - Charming Towns of Northern California's Wine Country Slideshow at Frommer's

Calistoga - Charming Towns of Northern California's Wine Country Slideshow at Frommer's

10:15 am installing the 3/8 stone base for under the pool.

10:15 am installing the 3/8 stone base for under the pool.

1:00 pm final deck forming and grading work completed.

1:00 pm final deck forming and grading work completed.

Spreader beam installed and ready to be lifted safely into hole.

Spreader beam installed and ready to be lifted safely into hole.

Check out the family play bench that runs along this pool.

Check out the family play bench that runs along this pool.

10:25 getting the base closer to installing a 16 by 40 pool.

10:25 getting the base closer to installing a 16 by 40 pool.