Explore these ideas and much more!

February 2013.  Jesse paints the walls and lays down crown molding and floor boards.

February 2013. Jesse paints the walls and lays down crown molding and floor boards.

Adding the curtain rod in the back of the store.

Adding the curtain rod in the back of the store.

January.  Assembly of shelving.

January. Assembly of shelving.

Window washing the night before.

Window washing the night before.

Jesse paints the facade.

Jesse paints the facade.

Cleaning the windows the night before!

Cleaning the windows the night before!

Painting out the front of store.

Painting out the front of store.

February 2013: Walls and Floors painted, molding down, chandelier up.  This was a long process.

February 2013: Walls and Floors painted, molding down, chandelier up. This was a long process.

Window washing the night before.

Window washing the night before.

Carole is inputting all the inventory into our POS system.  She also helped me walk the neighborhood to pass out flyers about the grand opening.  She is an angel - a gift from the universe.  THANK YOU CAROLE!!!!

Carole is inputting all the inventory into our POS system. She also helped me walk the neighborhood to pass out flyers about the grand opening. She is an angel - a gift from the universe. THANK YOU CAROLE!!!!

Pinterest
Search